Duke Energy Queensgate Ops Center Restroom & Locker Room Renovation

Location: Cincinnati, Ohio

Delivery Method: GC

Industry: Industrial

Architect: Champlin Architecture

Mechanical Engineer: ThermalTech

Description:

This project consisted of a complete interior demolition and build-out of a new 2,500 SF first-floor men’s and women’s restroom and locker room facility at the Duke Energy Queensgate Operations Center. Universal deliv-ered a full gut and renovation to create modern, durable, and code-compliant facilities designed to support daily operational staff needs.

The project scope included:

  • Complete demolition of existing restroom and locker room facilities
  • New underground plumbing rough-ins and trench drains
  • Reconfigured layout for plumbing fixtures and prefabricated shower units
  • New ceramic tile flooring and wet wall systems
  • New hard ceilings at shower areas and acoustical ceilings at locker rooms
  • New toilet partitions, toilet accessories, and stone sink countertops
  • New electrical systems including LED light fixtures
  • New HVAC ductwork, diffusers, and control systems
  • New hollow metal doors, frames, and hardware

The project was completed over a five-month duration and successfully delivered in December 2023.

Architect: Champlin Architecture Mechanical Engineer: ThermalTech